27 CA ADC § 20324


      27 CCR s 20324

      Cal. Admin. Code tit. 27, s 20324


      CALIFORNIA CODE OF REGULATIONS
      TITLE 27. ENVIRONMENTAL PROTECTION
      DIVISION 2. SOLID WASTE
      SUBDIVISION 1. CONSOLIDATED REGULATIONS FOR TREATMENT, STORAGE, PROCESSING
      OR DISPOSAL OF SOLID WASTE
      CHAPTER 3. CRITERIA FOR ALL WASTE MANAGEMENT UNITS, FACILITIES, AND 
      DISPOSAL
      SITES
      SUBCHAPTER 2. SITING AND DESIGN
      ARTICLE 4. SWRCB - WASTE MANAGEMENT UNIT CONSTRUCTION STANDARDS
      This database is current through 04/21/06, Register 2006, No. 16. 

      s 20324. SWRCB - CQA Requirements. (T14: s17774)

      (a) Performance Standard -The construction quality assurance (CQA) 
      program, including all relevant aspects of construction quality control 
      (CQC), shall provide evidence that materials and procedures utilized in 
      the placement of the any containment feature at a waste management unit 
      (Unit) will be tested and monitored to assure the structure is constructed 
      in accordance with the design specifications approved by the RWQCB.

      (b) Professional Qualifications.

      (1) The design professional who prepares the CQA plan shall be a 
      registered civil engineer or certified engineering geologist; and

      (2) The construction quality assurance program shall be supervised by a 
      registered civil engineer or certified engineering geologist who shall be 
      designated the CQA officer.

      (c) Reports.

      (1) The project's CQA report shall address the construction requirements, 
      including any vegetation procedures, set forth in the design plan for the 
      containment system. For each specified phase of construction, this report 
      shall include, but not be limited to:

      (A) a delineation of the CQA management organization, including the chain 
      of command of the CQA inspectors and contractors;

      (B) a detailed description of the level of experience and training for the 
      contractor, the work crew, and CQA inspectors for every major phase of 
      construction in order to ensure that the installation methods and 
      procedures required in the containment system design will be properly 
      implemented.

      (C) a description of the CQA testing protocols for preconstruction, 
      construction, and postconstruction which shall include at a minimum:

      1. the frequency of inspections by the operator,

      2. the sampling and field testing procedures and equipment to be utilized, 
      and the calibration of field testing equipment,

      3. the frequency of performance audits determined by the design 
      professional and examined by the CQA officer,

      4. the size, method, location and frequency of sampling, sampling 
      procedures for laboratory testing, the soils or geotechnical laboratory to 
      be used, the laboratory procedures to be utilized, the calibration of 
      laboratory equipment and quality assurance and quality control of 
      laboratory procedures,

      5. the pass/fail criteria for sampling and testing methods used to achieve 
      containment system design, and

      6. a description of the corrective procedures in the event of test 
failure.

      (d) Documentation -Construction quality assurance documentation 
      requirements shall include, at the minimum: reports bearing unique 
      identifying sheet numbers for cross-referencing and document control, the 
      date, project name, location, descriptive remarks, the data sheets, 
      inspection activities, and signature of the designated authorities with 
      concurrence of the CQA officer.

      (1) The documentation shall include:

      (A) Daily Summary Reports -daily recordkeeping, which shall include 
      preparation of a summary report with supporting inspection data sheets, 
      problem identification and corrective measures reports. Daily summary 
      reports shall provide a chronological framework for identifying and 
      recording all other reports. Inspection data sheets shall contain all 
      observations (i.e., notes, charts, sketches, or photographs), and a record 
      of field and/or laboratory tests. Problem identification and corrective 
      measures reports shall include detailed descriptions of materials and/or 
      workmanship that do not meet a specified design and shall be 
      cross-referenced to specific inspection data sheets where the problem was 
      identified and corrected;

      (B) Acceptance Reports -all reports shall be assembled and summarized into 
      Acceptance Reports in order to verify that the materials and construction 
      processes comply with the specified design. This report shall include, at 
      a minimum, inspection summary reports, inspection data sheets, problem 
      identification and corrective measures reports;

      (C) Final Documentation -at the completion of the project, the operator 
      shall prepare a Final Documentation which contains all reports submitted 
      concerning the placement of the containment system. This document shall 
      provide evidence that the CQA plan was implemented as proposed and that 
      the construction proceeded in accordance with design criteria, plans, and 
      specifications. The discharger shall submit copies of the Final 
      Documentation report to the RWQCB as prepared by the CQA officer.

      (2) Once construction is complete, the document originals shall be stored 
      by the discharger in a manner that will allow for easy access while still 
      protecting them from any damage. All documentation shall be maintained 
      throughout the postclosure maintenance period.

      (e) Laboratory Testing Requirements. [Note: the following (ASTM) standards 
      are available from the American Society of Testing and Materials (ASTM), 
      100 Barr Harbor Drive, West Conshohocken, PA 19428-2929, phone: 
      610-832-9585 ]

      (1) Analysis of earthen materials shall be performed prior to their 
      incorporation into any containment system component. Representative 
      samples for each layer within the containment system shall be evaluated. 
      The following minimum laboratory testing procedures shall be performed:

      (A) ASTM Designation: D 1557-91 [1/91], "Laboratory Compaction 
      Characteristics of Soil Using Modified Effort (2,700 kN-m/m3)" which is 
      incorporated by reference;

      (B) ASTM Designation: D 422-63 (Reapproved) [9/90], "Standard Method for 
      Particle-Size Analysis of Soils," which is incorporated by reference; and

      (C) ASTM Designation: D 2487-93 [11/93], "Standard Classification of Soils 
      for Engineering Purposes," which is incorporated by reference.

      (2) In addition to the tests listed in ¶(e and f), the following minimum 
      laboratory tests shall be performed on low-hydraulic-conductivity layer 
      components constructed from soil:

      (A) ASTM Designation: D 4318-93 [11/93], "Standard Test Method for Liquid 
      Limit, Plastic Limit, and Plasticity Index of Soils," which is 
      incorporated by reference; and

      (B) United States Environmental Protection Agency (USEPA) Test Method 9100 
      [Approved 9-86], "Triaxial-Cell Method with Back Pressure," which is 
      incorporated by reference.

      (f) Field Testing Requirements -The following minimum field test procedure 
      shall be performed for each layer in the containment system: ASTM 
      Designation: D 2488-93 [9/93], Standard Practice for Description and 
      Identification of Soils (Visual-Manual Procedure), which is incorporated 
      by reference.

      (g) Test Fill Pad Requirements -Before installing the compacted soil 
      barrier layer component of a final cover system, or the compacted soil 
      component of a liner system, the operator shall accurately establish the 
      correlation between the design hydraulic conductivity and the density at 
      which that conductivity is achieved. To accomplish this the operator 
shall:

      (1) provide a representative area for a test on any compacted foundation 
      and low-hydraulic- conductivity layers. The following minimum testing 
      procedures shall be performed:

      (A) the test pad foundation and, for final covers, the barrier layers 
      shall be compacted with the designated equipment to determine if the 
      specified density/moisture-content/hydraulic- conductivity relationships 
      determined in the laboratory can be achieved in the field with the 
      compaction equipment to be used and at the specified lift thickness;

      (2) perform laboratory tests as specified in subsection (e); and

      (3) perform field tests as specified in subsection (f). The discharger 
      shall perform hydraulic conductivity tests in the test area under 
      saturated conditions by using the standard test method ASTM Designation: D 
      3385-94 [9/94], "Standard Test Method for Infiltration Rate of Soils in 
      Field Using Double-Ring Infiltrometer," which is incorporated by 
      reference, for vertical hydraulic conductivity measurements. A sufficient 
      number of tests shall be run to verify the results. Other methods that 
      provide an accurate and precise method of measuring field hydraulic 
      conductivity may be utilized as approved by the RWQCB.

      (4) Correlations between laboratory tests and test pad results shall be 
      established for each of the various types of fill materials and blends to 
      be used in construction of the actual cover.

      (h) Earthen Material Requirements.

      (1) The following minimum tests shall include, but not be limited to:

      (A) Laboratory tests as specified in ¶(e); and

      (B) Field tests as specified in subsections (f and g).

      (2) The following minimum testing frequencies shall be performed:

      (A) Four (4) field density tests shall be performed for each 1,000 cubic 
      yards of material placed, or at a minimum of four (4) tests per day;

      (B) Compaction curve data (ASTM Designation: D 1557-91) graphically 
      represented, and Atterberg limits (ASTM Designation: D 4318-93) shall be 
      performed on the barrier layer material once a week and/or every 5,000 
      cubic yards of material placed;

      (C) For field hydraulic conductivity tests, representative samples shall 
      be performed on barrier layer material;

      1. The frequency of testing may be increased or decreased, based on the 
      pass/failure status of previous tests, as approved by the RWQCB.

      2. Field infiltration tests shall be performed for the duration necessary 
      to achieve steady conditions for the design hydraulic conductivity.

      3. The following interpretive equation shall be used to determine the 
      design hydraulic conductivity:

      The infiltration rate (1) is defined as:

      I = Q/(tA)

      where Q = volume of flow; t = interval of time corresponding to flow Q; 
      and A = area of the ring;

      then the hydraulic conductivity (k) can be calculated from Darcy's law as 
      follows:

      k = I/i

      where: I = infiltration rate; and i = hydraulic gradient.

      (i) Geosynthetic Membrane Requirements.

      (1) Performance requirements for the geosynthetic membrane include, but 
      are not limited to, the following:

      (A) a need to limit infiltration of water, to the greatest extent 
possible;

      (B) a need to control landfill gas emissions;

      (C) for final covers, mechanical compatibility with stresses caused by 
      equipment traffic, and the result of differential settlement of the waste 
      over time; and

      (D) for final covers, durability throughout the postclosure maintenance 
      period.

      (2) Minimum Criteria -The minimum construction quality assurance criteria 
      to ensure that geosynthetic membranes will meet or exceed all design 
      specifications shall include, but not be limited to:

      (A) Preconstruction quality control program:

      1. inspection of the raw materials (e.g., density, melt flow index, 
      percent carbon Black);

      2. manufacturing operations and finished product specifications (e.g., 
      thickness, puncture resistance, multi-axial stress/strain tests),

      3. fabrication operations (e.g., factory seaming);

      4. observations related to transportation, handling, and storage of the 
      geosynthetic membrane; and

      5. inspection of foundation preparation;

      (B) Construction activities:

      1. the geosynthetic membrane shall have thickness strength sufficient to 
      withstand the stresses to which it shall be subjected, including shear 
      forces, puncture from rocks or, for final covers, penetration from roots.

      2. inspection of geosynthetic membrane placement (e.g., trench corners, 
      monitoring systems).

      3. seaming of the material; and

      4. installation of anchors and seals;

      (C) Postconstruction Activity -postconstruction activity includes checking 
      for material and placement imperfections in the installed geosynthetic 
      membrane. Imperfections that jeopardize the integrity of the membrane's 
      function as an impermeable barrier (i.e., pin holes, rips, creases created 
      during placement) shall be repaired to the original manufacturer's 
      specifications and reinspected by the CQA officer; and

      (D) Evaluation -evaluation of the personnel and equipment to be used to 
      install and inspect the geosynthetic membrane, and pass/fail criteria and 
      corrective procedures for material and installation procedures shall be 
      specified as required in ¶(c).


      


      Note: Authority cited: Section 1058, Water Code. Reference: Sections 13172 
      and 13360, Water Code; and Section 43103, Public Resources Code. 


       HISTORY 
         
      1. New section filed 6-18-97; operative 7-18-97 (Register 97, No. 25).
      27 CA ADC s 20324

      END OF DOCUMENT

      (c) Copyright 2006, Result Oriented Marketing, Inc.
      For Further Assistance Visit : www.mcmillanlaw.us and www.fearnotlaw.com  
 
Home | About Us | Contact Form | Contact Us | Useful Links


© Copyright 2006, Result Oriented Marketing, Inc.
For Further Assistance Visit : www.mcmillanlaw.us and www.fearnotlaw.com