27 CA ADC § 20330
27 CCR s 20330
Cal. Admin. Code tit. 27, s 20330
CALIFORNIA CODE OF REGULATIONS
TITLE 27. ENVIRONMENTAL PROTECTION
DIVISION 2. SOLID WASTE
SUBDIVISION 1. CONSOLIDATED REGULATIONS FOR TREATMENT, STORAGE, PROCESSING
OR DISPOSAL OF SOLID WASTE
CHAPTER 3. CRITERIA FOR ALL WASTE MANAGEMENT UNITS, FACILITIES, AND
DISPOSAL
SITES
SUBCHAPTER 2. SITING AND DESIGN
ARTICLE 4. SWRCB - WASTE MANAGEMENT UNIT CONSTRUCTION STANDARDS
This database is current through 04/21/06, Register 2006, No. 16.
s 20330. SWRCB - Liners. (C15: s2542)
(a) Performance Standard -Liners shall be designed and constructed to
contain the fluid, including landfill gas, waste, and leachate, as
required by Article 3 of this subchapter (s20240 et seq., and s20310).
(b) Clay Liners -Clay liners for a Class II Unit shall be a minimum of 2
feet thick and shall be installed at a relative compaction of at least 90
percent. For a Class III landfill, a clay liner, if required, shall be a
minimum of 1- foot thick and shall be installed at a relative compaction
of at least 90 percent. For MSW landfills subject to the liner
requirements in the federal MSW regulations of 40CFR258, after the Federal
Deadline for liners at that Unit, the requirements of this paragraph are
superseded by those of SWRCB Resolution No. 93-62 for all portions of the
Unit outside the Existing Footprint.
(c) FMLs -Flexible membrane liners ( "FMLs", or synthetic liners) shall
have a minimum thickness of 40 mils (i.e., 0.040 "). For an MSW landfill
subject to the liner requirements in the federal MSW regulations
(40CFR258), after the Federal Deadline for liners at that Unit, the
requirements of this paragraph are superseded by those of SWRCB Resolution
No. 93-62 for all portions of the Unit outside the Existing Footprint.
(d) Lined Area -Liners shall be installed to cover all natural geologic
materials (at the Unit) that are likely to be in contact with waste
(including landfill gas or leachate).
(e) S.I. With Replaceable Liner -A Class II surface impoundment may have a
single clay liner with a hydraulic conductivity of 1x10 [FN-6] cm/sec
(i.e., 1 foot/year) or less if the liner is removed or replaced before the
last 25 percent (minimum 1 foot thickness) of the liner is penetrated by
fluid, including waste or leachate. The method used to determine seepage
velocity shall be included with the calculations of liner penetration.
Note: Authority cited: Section 1058, Water Code. Reference: Sections 13172
and 13360, Water Code; and Section 43103, Public Resources Code.
HISTORY
1. New section filed 6-18-97; operative 7-18-97 (Register 97, No. 25).
27 CA ADC s 20330
END OF DOCUMENT
(c) Copyright 2006, Result Oriented Marketing, Inc.
For Further Assistance Visit : www.mcmillanlaw.us and www.fearnotlaw.com
|