TITLE 21. Public Works

DIVISION 2.5. DIVISION OF AERONAUTICS (DEPARTMENT OF TRANSPORTATION)

CHAPTER 1. GENERAL PROVISIONS
21 CA ADC T. 21, Div. 2.5, Chap. 1, References and Annotations

CHAPTER 2. AIRPORTS AND HELIPORTS

ARTICLE 1. DEFINITIONS
s 3525. Preamble.

s 3526. General.

s 3527. Definitions.

s 3528. Applications.

s 3529. Notice to Interested Parties.

ARTICLE 2. PERMITS
s 3530. Permit Requirements.

s 3531. Site Approval Permits.

s 3532. Temporary Permits (Airports Only).

s 3533. Exemptions.

s 3534. Applications for an Airport Permit.

s 3535. Processing Time.

s 3536. Revocation and Suspension.

s 3537. Temporary Permits (for Period Not More Than 30 Days).

ARTICLE 3. DESIGN STANDARDS, AIRPORTS ONLY
s 3540. General.

s 3541. Obstructions and Hazards.

s 3542. Airport Design Standards.

s 3543. Marking, Lighting and Visual Aids.

s 3544. Personal-Use Airports.

s 3545. Special-Use Airports.

ARTICLE 4. DESIGN STANDARDS, HELIPORTS ONLY
s 3550. General.

s 3551. Heliport Design Standards.

s 3552. Heliport Imaginary Surfaces.

s 3553. Elevated Heliport Design.

s 3554. Marking, Lighting, and Visual Aids.

s 3555. Surface Stabilization and Pavement Design.

s 3556. Fire Protection.

s 3557. Applications.

s 3558. Notice to Interested Parties.

s 3559. Site Approval Permit or Amended Site Approval Permit Requirements.

ARTICLE 5. PERSONAL-USE AIRPORTS
s 3560. General.

Appendix

CHAPTER 2.1. SCHOOL SITE EVALUATION CRITERIA
s 3570. School Site Evaluation Criteria.

CHAPTER 2.5. RECREATION AND RELIEVER TRAINING AIRPORTS

ARTICLE 1. GENERAL
s 3580. Definitions.

ARTICLE 2. PROGRAM
s 3585. Program.

s 3586. Program Implementation.

ARTICLE 3. CRITERIA
s 3590. Design.

s 3591. Restrictions.

s 3592. Waivers.

CHAPTER 3. PARACHUTE JUMPING
21 CA ADC T. 21, Div. 2.5, Chap. 3, References and Annotations

CHAPTER 4. CALIFORNIA AID TO AIRPORTS PROGRAM

ARTICLE 1. GENERAL
s 4050. Purpose.

s 4051. Waivers.

s 4052. Definitions.

ARTICLE 2. SPONSOR ELIGIBILITY
s 4055. Requirements.

s 4056. Permit and Funding Requirements.

s 4057. Operational Requirements.

s 4058. Airport Protection Requirements.

ARTICLE 3. PROJECT ELIGIBILITY
s 4059. Ineligible Projects.

s 4060. Resolution of Unallowable Costs.

s 4061. Eligible Acquisition and Development (A&D) Projects.

s 4062. Eligible Annual Credit Projects.

s 4062.1. Eligible AIP Matching Projects.

ARTICLE 4. ACQUISITION AND DEVELOPMENT (A&D) GRANTS
s 4063. Program Description.

s 4064. A&D Project Application Process.

s 4065. Allocation Procedures.

ARTICLE 5. AIRPORT IMPROVEMENT PROGRAM (AIP) MATCHING GRANTS
s 4066. Program Description.

s 4067. AIP Matching Grant Application Process.

ARTICLE 6. ANNUAL CREDIT
s 4069. Program Description and Annual Credit Disbursement Process.

CHAPTER 5. CALIFORNIA AIRPORT LOAN PROGRAM
s 4070. Program Description.

s 4071. Conditions of Eligibility.

s 4072. Project Feasibility Requirements.

s 4072.1. Application Process.

s 4073. Servicing of the Loan.

Appendix

CHAPTER 6. NOISE STANDARDS

ARTICLE 1. GENERAL
s 5000. Preamble.

s 5001. Definitions.

s 5002. Liberal Construction.

s 5003. Constitutionality.

s 5004. Provisions Not Exclusive.

s 5005. Applicability.

s 5006. Findings.

s 5010. Purpose.

s 5011. Methodology for Controlling and Reducing Noise Problems.

s 5012. Airport Noise Standard.

s 5013. Noise Impact Boundary.

s 5014. Incompatible Land Uses Within the Noise Impact Boundary.

s 5015. Changes in Airport Ownership or Control.

ARTICLE 2. IMPLEMENTATION BY COUNTIES
s 5020. Designating Noise Problem Airport.

s 5021. Review of Finding.

s 5022. County Enforcement.

s 5023. Noise Monitoring.

s 5024. Audit.

s 5025. County Report.

ARTICLE 3. IMPLEMENTATION BY AIRPORT PROPRIETORS
s 5030. Cooperation with County.

s 5031. Establishment of the Noise Impact Boundary.

s 5032. Validation of the Noise Impact Boundary.

s 5033. Submittal of Monitoring Plan.

s 5034. Frequency of Measurement.

s 5035. Schedule of Implementation.

s 5037. Suggested Methodology for Controlling and Reducing Noise Problems.

s 5039. Grounds for Approval.

ARTICLE 4. IMPLEMENTATION BY THE DEPARTMENT
s 5040. Departmental Review.

s 5041. Hearing on Determination.

s 5042. Effective Date of Determination.

s 5043. Approval of Noise Monitoring Plans.

s 5044. Review of Quarterly Reports.

s 5045. Retention of Monitoring Data.

s 5046. Detailed Specifications.

s 5047. Deviations from Specified Measurement Locations.

s 5048. Additional Monitoring Locations.

s 5049. Alternative Measurement Systems.

ARTICLE 5. VARIANCES
s 5050. Variances.

s 5051. Variance Request.

s 5052. Procedure.

s 5053. Conditions of Variance.

s 5054. Reasonable Conditions.

s 5055. Hearing.

s 5056. Burden of Proof.

s 5057. Additional Variances.

ARTICLE 6. (RESERVED)
s 5060. Monitoring Requirements.

s 5061. Single Event Noise Limit Violations.

s 5062. Noise Impact Area Violations.

s 5063. Submittal of Monitoring Plan.

s 5064. Grounds for Approval.

s 5065. Implementation by the Department.

ARTICLE 7. NOISE MONITORING SYSTEM REQUIREMENTS
s 5070. General Specifications.

s 5071. Detailed Specifications.

s 5072. Field Measurement Requirements.

s 5073. Number of Measurement Systems.

s 5075. Variances.

ARTICLE 8. SPECIFICATION: NOISE MONITORING SYSTEM
s 5080. Purpose and Scope.

s 5080.1. Additional Definitions Applicable to Article 8.

s 5080.2. Examples of Possible System Configurations.

s 5080.3. Performance Specifications.

s 5080.4. Field Calibration.

s 5080.5. Environmental Precautions and Requirements.

ARTICLE 9. CHANGES IN AIRPORT OWNERSHIP
s 5090. Changes in Airport Ownership or Control.
 
Home | About Us | Contact Form | Contact Us | Useful Links


© Copyright 2006, Result Oriented Marketing, Inc.
For Further Assistance Visit : www.mcmillanlaw.us and www.fearnotlaw.com