|
|
TITLE
23. Waters
DIVISION
1. RECLAMATION BOARD
23
CA ADC T. 23, Div. 1, References and Annotations
CHAPTER 1. ORGANIZATION, POWERS AND STANDARDS
ARTICLE
1. AUTHORITY, PURPOSE, SCOPE, AND INTENT
s 1. Authority.
s 2. Purpose,
Scope.
s 3. Intent.
ARTICLE 2. DEFINITIONS AND DELEGATIONS
s 4. Definitions.
s 5. Delegations.
ARTICLE 3. APPLICATION PROCEDURES
s 6. Need
for a Permit.
s 7. Endorsement
by Local Maintaining Agency
s 8. Applications.
s 9. Acknowledgement
of Receipt, Completeness of Applications,
and Notice to Contiguous Landowners.
s 10. Environmental
Review.
s 11. Variances.
s 12. Protests.
s 13. Hearings.
s 14. Board
Decision.
s 15. Bases
for Denial of Applications.
s 16. Permit
Conditions.
s 17. Emergencies.
s 18. Revisions
in Plans.
s 19. District
Lands.
ARTICLE 4. ENFORCEMENT PROCEEDINGS
s 20. Initiation.
s 21. Hearing.
s 22. Board
Decision.
ARTICLE 4.1. RECONSIDERATION
s 23. Reconsideration.
ARTICLE 5. DESIGNATED FLOODWAYS
s 101. Responsibility
of the Board.
s 102. Considerations
in Designating Floodways.
s 103. Notices and Hearings.
s 104. Recording.
s 105. Availability
of Maps.
s 106. Floodway
Modifications.
s 107. Permitted
Uses in Designated Floodways.
ARTICLE 6. EXISTING ENCROACHMENTS WITHIN
AN ADOPTED PLAN OF FLOOD CONTROL
s 108. Existing
Encroachments.
ARTICLE 7. REVIEW RIGHTS
s 109. Right
of Review of Delegated Authority.
s 110. Review
Procedures.
ARTICLE 8. STANDARDS
s 111. Introduction
to Standards.
s 112. Streams
Regulated and Nonpermissible Work Periods.
s 113. Dwelling
and Structures Within an Adopted Plan of Flood
Control.
s 114. Mobile
Home Parks and Recreational Vehicle Parks.
s 115. Dredged,
Spoil, and Waste Material.
s 116. Borrow
and Excavation Activities - Land and Channel.
s 117. Supplemental Borrow Standards for the
Yuba River.
s 118. Supplemental
Borrow Standards for the Lower San Joaquin
River Flood Control Project.
s 119. Dams
and Related Structures.
s 120. Levees.
s 121. Erosion
Control.
s 122. Irrigation
and Drainage Ditches, Tile Drains, and Septic
Systems.
s 123. Pipelines,
Conduits, and Utility Lines.
s 124. Abandoned
Pipelines and Conduits.
s 125. Retaining
Walls.
s 126.
Fences and Gates.
s 127. Boating
Facilities.
s 128. Bridges.
s 129. Water,
Oil, and Gas Wells.
s 130. Patrol
Roads and Access Ramps.
s 131. Vegetation.
s 132. Bicycle
Trails.
s 133. Supplemental
Standards for Control of Residential Encroachments
in Reclamation District 1000.
s 134. Supplemental
Standards for The Yuba River - Daguerre Point
Dam to Confluence with The Feather River.
s 135. Supplemental
Standards for Butte Basin.
s 136. Supplemental
Standards for Yolo Bypass and Sutter Bypass.
s 137. Miscellaneous
Encroachments.
ARTICLE 9. REGULATIONS FOR IMPLEMENTATION
OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
s 190. Purpose
and Authority.
s 191. Incorporation
of California Environmental Quality Act Guidelines.
s 192. Fees
for Preparation of Negative Declaration or
EIR.
s 193. Categorically
Exempt Activities.
Appendix A
|
|
DIVISION 1.5 FLOOD
PLAIN MANAGEMENT (DEPARTMENT OF WATER RESOURCES AND RECLAIMATION
BOARD
DIVISION 2. DEPARTMENT
OF WATER RESOURCES
CHAPTER 1.
DAMS AND RESERVOIRS
23
CA ADC T. 23, Div. 2, Chap. 1, References and Annotations
ARTICLE 1. GENERAL PROVISIONS
s 301. Definitions.
s 302. Purpose
and Effect of Regulations.
s 303. Evidence
of Water Rights.
s 304. Civil
Engineering Plans and Specifications.
s 305. Civil
Engineering Supervision of Construction.
s 306. Authority
of Representative.
ARTICLE 2. APPLICATIONS FOR CONSTRUCTION,
ENLARGEMENT, REPAIR, ALTERATION, OR REMOVAL OF DAMS
OR RESERVOIRS
s 310. Applications
for Construction or Enlargement.
s 310.1. Criteria
for Determining Completeness.
s 310.2. Criteria
for Determining Completeness.
s 310.3. Determination
of Completeness.
s 311. Criteria
for Determining Completeness.
s 312. Standard
Terms.
s 313. Automatic
Approval of Applications.
s 314. Filing
Fee.
ARTICLE 3. ANNUAL FEE
s 315. Annual
Fee.
s 316. Inoperative
Dams.
s 317. Preparation
of Application for Repair or Alteration.
s 318. Preparation
of Application for Removal.
s 319. Annual
Fee.
ARTICLE 4. SMALL DAMS REVIEW BOARD
s 320. Small
Dams Review Board.
s 321. Scope
of Review.
s 322. Small
Dam Defined.
s 323. Time
to Request Board Review; Filing Fee.
s 324. Time
and Conduct of Review.
s 325. Findings
of the Board.
ARTICLE 5. DAMS OWNED BY THE DEPARTMENT OF
WATER RESOURCES
s 330. Consulting
Board.
s 331. Scope
of Review.
s 332. Actions
for Which Board Is Retained.
s 333. Periodic
Review.
CHAPTER 1.5 LEVEE AND RIGHT OF WAY CONTROL
23
CA ADC T. 23, Div. 2, Chap. 1.5, References and
Annotations
CHAPTER 1.6. RELOCATION ASSISTANCE PROGRAM
ARTICLE 1. GENERAL
s 370. Definitions.
s 370.01.
Relocation Plans.
s 370.02. Eviction
Policy.
s 370.03. Eligibility.
s 370.04. Standards
for Decent, Safe, and Sanitary Dwellings.
ARTICLE 2. RELOCATION PAYMENTS
s 370.10. Relocation
Payments -General Provisions.
s 370.11. Moving
and Related Expense Payments -General Provisions
for All Relocated Individuals, Families, Businesses
and Farms.
s 370.12. Moving
Payments to Individuals and Families.
s 370.13. Moving
Payments to Business or Farm.
s 370.14. Moving
Payments to Nonprofit Organizations.
s 370.15. Advertising
Signs.
s 370.16. Replacement
Housing Payments.
s 370.17.
Replacement Housing Payments to Owner-Occupant for
180 Days or More Who Purchases a Replacement Dwelling.
s 370.18.
Rental Differential Payment to Owner-Occupant for
180 Days or More Who Rents a Replacement Dwelling.
s 370.19. Replacement
Housing Payment to Owner-Occupant for Less Than
180 Days but Not Less Than 90 Days Who Purchases
a Replacement Dwelling.
s 370.20. Rental
Differential Payment to Owner-Occupant for Less
Than 180 Days but Not Less Than 90 Days Who Rents
a Replacement Dwelling.
s 370.21. Rental
Differential Payment to Tenant-Occupant for Not
Less Than 90 Days Who Rents a Replacement Dwelling.
s 370.22. Replacement
Housing Payment to Tenant-Occupant for Not Less
Than 90 Days Who Purchases a Replacement Dwelling.
s 370.23. Replacement
Housing Payment to Tenant of a Sleeping Room for
Not Less Than 90 Days.
s 370.24. Mobile
Homes.
s 370.25. Moving
Expenses for Mobile Homes.
s 370.26. Replacement
Housing Payments -Mobile Homes.
s 370.27. Housing
Provided As a Last Resort -General.
s 370.28. Temporary
Moves for Rehabilitation.
ARTICLE 3. ACQUISITION POLICIES
s 370.40. General.
CHAPTER 1.7.
SELECTION PROCESS FOR PRIVATE ARCHITECTURAL, LANDSCAPE
ARCHITECTURAL, ENGINEERING, ENVIRONMENTAL, LAND
SURVEYING, AND CONSTRUCTION PROJECT ...
ARTICLE 1. GENERAL PROVISIONS
s 380. Purpose
and Scope.
s 381. Definitions.
s 381.1. Announcements
for Statement of Qualifications and Performance
Data.
ARTICLE 2. SPECIFIC PROVISIONS
s 382. Establishment
of Criteria.
s 383.
Estimate of Value of Services.
s 384.
Request for Qualifications - Publication of Announcement.
s 385.
Selection Process.
s 386. Negotiation.
s 386.1.
Length of Agreements.
s 387. Amendments.
s 388. Alternative
Contract Procedures.
s 389. Director's
Power to Require Bids.
s 390. Exclusions.
s 391. Prohibited
Practices and Conflict of Interest.
|
DIVISION 3. STATE
WATER RESOURCES CONTROL BOARD AND REGIONAL WATER QUALITY
CONTROL BOARDS
DIVISION 4. REGIONAL WATER QUALITY CONTROL BOARDS
DIVISION 5. PREVENTION OF WASTE, UNREASONABLE USE
OR DIVERSION OF WATER (STATE WATER RESOURCES CONTROL BOARD
AND DEPARTMENT OF WATER RESOURCES) |
|
|